Key Results
100% Turnkey APC Project Financed and Performance-Guaranteed by Enero Solutions
+15,000 t
+30,000 MWh
-30% %
-2,500 t
+4.5 %
-250,000 Average / L
-50 % Process Variability
Challenges
Combustion Variability
Stabilize waste combustion regardless of NCV variations to ensure maximum availability and reliability of incineration furnaces.
Prioritization of Energy Needs
The generated energy must be dynamically allocated to prioritize supplying the Paris district heating network, while meeting the facility’s own electrical needs and monetizing surplus power through grid export.
Overall Energy Performance
Fluctuations in combustion and energy demand complicate the simultaneous optimization of steam production and export, limiting overall energy efficiency and reducing the value generated per ton of processed waste.