Results
– Use of off-gases (COG, BFG) optimized
– Natural gas use reduced
– On-site power generation increased
– Natural gas use reduced
– On-site power generation increased
≈100 %
+2.70 M$/year
Site description
Challenges
Optimizing mill energy cost is difficult due to a combination of factors:
•Constant changes in energy use by process operations
•Variation in availability of “free” fuels (COG and BFG)
•Hourly fluctuation in natural gas pricing
•Complex power contract for purchase and export
Emissions constraints
Process Description
Site is an integrated steel manufacturing operation. Steam and electricity needed for production is provided through utility processes including:
•(6) Power boilers
•(3) Steam headers
•(3) Steam turbine generators